T-15 GAS DEPENDENCY RISK INDEX LIVE MISSISSIPPI POWER: HIGHEST RISK · 91% GAS · 100% SPOT · CAR $70.52/MO 60 OF 120 OPERATORS HIGH RISK IN 2024 CONED: 100% GAS · ZERO COST AT RISK · FULLY CONTRACTED
T-15 · Gas Dependency Risk Index

Gas Dependency Risk
Exposure Score & Ratepayer Cost at Risk

● Live 171 Utilities 2011–2024 EIA Form 923 + Form 861

Methodology — Gas Exposure Score

The Gas Exposure Score (0–100) measures structural vulnerability to gas price volatility:

Gas Exposure Score = (Gas Generation % × 0.50) + (Spot Purchase % × 0.50)

High Risk = above median exposure AND spot % ≥ 50%. Managed Risk = high gas generation but low spot. Moderate Risk = low gas but high spot. Low Risk = below median on both. ConEd generates 100% from gas but buys it all on fixed contracts — managed risk. Mississippi Power buys 100% at spot with 91% gas — maximum structural exposure.

High Risk Operators — 2024
60/120
High gas generation AND spot % ≥ 50%
Median Exposure Score — 2024
0–100 · 50% gas generation + 50% spot purchase
Max Exposure — 2024
100.0
Kissimmee · Entergy TX · Entergy MS
Risk Levels
4 Levels
High · Moderate · Managed · Low
Median Gas Exposure Score & % High Risk — 2011–2024
Left: median exposure score · Right: % High Risk operators
Gas Exposure Score · High Risk = high gas generation AND spot % ≥ 50%
UtilitySt Exposure Score Gas Generation % Spot Purchase % Risk Level